Currently, when a winner is chosen and a new variation is going to be set up, the only options are to clone the winner, clone the winner in another funnel, or start from scratch.
We need the option to clone a previous variation.
So if my winner is control A, and added a section in B, in my next test I may have wanted to modify the section in B to test.
However, I can't. I either have to build C from A (the winner), modify B and lose tracking on the previous split test, or
-declare A the winner,
-then restore B,
-declare B the winner,
-then duplicate it to make C,
-declare C the winner,
-restore A.
This is excessive.
I would like to declare A the winner, but then for C, choose to duplicate B as a starting point.